GC INTECH
Innovative technologies and efficient engineering
EN | RU
+7 347-835-12-55
+7 917-747-93-53
Mon. – Fri.:  9:00 to 18:00
Republic of Bashkortostan, Neftekamsk, Lenin St., 47G, room. 1
About company
  • About company
  • Licenses and certificates
  • Partners
  • Reviews
  • News
  • Projects
  • Documents
    • Equipment catalogs
    • The questionnaires
Equipment
  • Deaerators
  • Vortex gas separators
  • Static mixers
    • Static mixers: oil - water
    • Static mixers: oil reagent
    • Static mixers: oil - alkali
    • Other static mixers
Engineering
  • Source data collection
    • Source data collection
  • Development of design and design solutions
    • Designing
    • Engineering services
  • Production and installation
    • Installation and supervision of installation
  • SMR, Poland, Commissioning Start-Up
    • Commissioning and start-up
Contacts
    GC INTECH
    About company
    • About company
    • Licenses and certificates
    • Partners
    • Reviews
    • News
    • Projects
    • Documents
      • Equipment catalogs
      • The questionnaires
    Equipment
    • Deaerators
    • Vortex gas separators
    • Static mixers
      • Static mixers: oil - water
      • Static mixers: oil reagent
      • Static mixers: oil - alkali
      • Other static mixers
    Engineering
    • Source data collection
      • Source data collection
    • Development of design and design solutions
      • Designing
      • Engineering services
    • Production and installation
      • Installation and supervision of installation
    • SMR, Poland, Commissioning Start-Up
      • Commissioning and start-up
    Contacts
      GC INTECH
      Телефоны
      +7 347-835-12-55
      +7 917-747-93-53
      EN / RU
      • About company
        • Назад
        • About company
        • About company
        • Licenses and certificates
        • Partners
        • Reviews
        • News
        • Projects
        • Documents
          • Назад
          • Documents
          • Equipment catalogs
          • The questionnaires
      • Equipment
        • Назад
        • Equipment
        • Deaerators
        • Vortex gas separators
        • Static mixers
          • Назад
          • Static mixers
          • Static mixers: oil - water
          • Static mixers: oil reagent
          • Static mixers: oil - alkali
          • Other static mixers
      • Engineering
        • Назад
        • Engineering
        • Source data collection
          • Назад
          • Source data collection
          • Source data collection
        • Development of design and design solutions
          • Назад
          • Development of design and design solutions
          • Designing
          • Engineering services
        • Production and installation
          • Назад
          • Production and installation
          • Installation and supervision of installation
        • SMR, Poland, Commissioning Start-Up
          • Назад
          • SMR, Poland, Commissioning Start-Up
          • Commissioning and start-up
      • Contacts
      • Главная
      • About company
      • News

      News

      For all the time
      2026
      2025
      2024
      2022
      2021
      2020
      Work is underway on the overhaul of the tank for contaminated condensate at Station No. 1 for the Karmanovskaya GRES.
      Work is underway on the overhaul of the tank for contaminated condensate at Station No. 1 for the Karmanovskaya GRES.
      04.06.2026
      On February 20, 2026, installation work was completed at the Zatonskaya Thermal Power Plant in Ufa
      On February 20, 2026, installation work was completed at the Zatonskaya Thermal Power Plant in Ufa
      26.02.2026
      Construction and installation works of the UDAV-300A modular deaeration unit have been completed at BSK JSC
      Construction and installation works of the UDAV-300A modular deaeration unit have been completed at BSK JSC
      22.12.2025
      The Vladivostok CHPP-2 has installed a VTD-2 modular deaerator (with a capacity of 300 t/h).
      The Vladivostok CHPP-2 has installed a VTD-2 modular deaerator (with a capacity of 300 t/h).
      30.10.2025
      For the BSK JSC facility, the assembly of a deaerator tank and an UDAV-300A deaerator was carried out under a supply contract with REM LLC.
      For the BSK JSC facility, the assembly of a deaerator tank and an UDAV-300A deaerator was carried out under a supply contract with REM LLC.
      30.10.2025
      Control cabinets for VTD-1 have been delivered to Vladivostokskaya TPP-2.
      Control cabinets for VTD-1 have been delivered to Vladivostokskaya TPP-2.
      19.08.2025
       The commissioning and testing of the UDAV-50VM modular vacuum-type deaerator has been completed in accordance with the equipment supply agreement with JSC Beloretskaya Pruzhina.
      The commissioning and testing of the UDAV-50VM modular vacuum-type deaerator has been completed in accordance with the equipment supply agreement with JSC Beloretskaya Pruzhina.
      04.06.2025
      Installation work has been completed under the equipment supply agreement with JSC Beloretskaya Pruzhina for the installation of the UDAV-50VM modular vacuum-type deaerator.
      Installation work has been completed under the equipment supply agreement with JSC Beloretskaya Pruzhina for the installation of the UDAV-50VM modular vacuum-type deaerator.
      23.05.2025
      Work is underway to manufacture the VTD-2 deaerator (with a capacity of 300 t/h).
      Work is underway to manufacture the VTD-2 deaerator (with a capacity of 300 t/h).
      14.05.2025
      Installation work is underway under a supply agreement with JSC Beloretskaya Pruzhina for the installation of the UDAV-50VM modular vacuum-type deaerator.
      Installation work is underway under a supply agreement with JSC Beloretskaya Pruzhina for the installation of the UDAV-50VM modular vacuum-type deaerator.
      22.04.2025
      On April 4, 2025, the fourth superstructure deaerator was shipped to the Kashira Thermal Power Plant under a supply agreement with Krasny Kotelshchik PJSC.
      On April 4, 2025, the fourth superstructure deaerator was shipped to the Kashira Thermal Power Plant under a supply agreement with Krasny Kotelshchik PJSC.
      07.04.2025
      According to the equipment supply agreement with JSC Beloretskaya Pruzhina, installation work is underway to install the UDAV-50VM modular vacuum-type deaerator.
      According to the equipment supply agreement with JSC Beloretskaya Pruzhina, installation work is underway to install the UDAV-50VM modular vacuum-type deaerator.
      01.04.2025
      On March 28, 2025, a centrifugal vortex deaerator for heating system feedwater was manufactured and shipped under the equipment supply contract.
      On March 28, 2025, a centrifugal vortex deaerator for heating system feedwater was manufactured and shipped under the equipment supply contract.
      01.04.2025
      On March 24, 2025, a modular vacuum-type deaerator, UDAV-50VM, was shipped under a supply agreement with JSC Beloretskaya Pruzhina.
      On March 24, 2025, a modular vacuum-type deaerator, UDAV-50VM, was shipped under a supply agreement with JSC Beloretskaya Pruzhina.
      24.03.2025
      On March 20, 2025, negotiations were held with UNICS LLC in the presence of a representative of the Customer (NHS JSC) regarding the development of RCD and the supply of two sets of deaeration equipment for the Yaisky Oil Refinery under construction
      On March 20, 2025, negotiations were held with UNICS LLC in the presence of a representative of the Customer (NHS JSC) regarding the development of RCD and the supply of two sets of deaeration equipment for the Yaisky Oil Refinery under construction
      20.03.2025
      On March 18, 2025, the UDAV-250A block-modular deaeration unit was shipped to the BSK JSC facility under a supply agreement with REM LLC.
      On March 18, 2025, the UDAV-250A block-modular deaeration unit was shipped to the BSK JSC facility under a supply agreement with REM LLC.
      19.03.2025
      On March 13, 2025, an act was signed on the completion of design work on calculating the chemical composition of recycled water, taking into account the use of inhibitors, for the construction of Unit 1 at the Ulan-Ude Thermal Power Plant-2, in accordance
      On March 13, 2025, an act was signed on the completion of design work on calculating the chemical composition of recycled water, taking into account the use of inhibitors, for the construction of Unit 1 at the Ulan-Ude Thermal Power Plant-2, in accordance
      17.03.2025
      For the BSK JSC facility, under a supply contract with REM LLC, work is underway to prepare the UDAV-250A block-modular deaeration unit for shipment.
      For the BSK JSC facility, under a supply contract with REM LLC, work is underway to prepare the UDAV-250A block-modular deaeration unit for shipment.
      13.03.2025
      On March 5, 2025, the third superstructure deaerator KU No. 3 for the Novocherkassk Thermal Power Plant was shipped under the equipment supply contract.
      On March 5, 2025, the third superstructure deaerator KU No. 3 for the Novocherkassk Thermal Power Plant was shipped under the equipment supply contract.
      05.03.2025
      Preparatory work is underway for the shipment of the third superstructure deaerator KU No. 3 for the Novocherkassk Thermal Power Plant.
      Preparatory work is underway for the shipment of the third superstructure deaerator KU No. 3 for the Novocherkassk Thermal Power Plant.
      03.03.2025
      • 1
      • 2
      • 3
      • 4
      © 2026 All rights reserved.
      Our contacts

      +7 347-835-12-55
      +7 917-747-93-53
      info@inntech-b2b.com
      Republic of Bashkortostan, Neftekamsk, Lenin St., 47G, room. 1
      Stay in touch