OJSC «TGC-11», Omsk CHP-3, UDAV-800A deaeration unit, 2 sets
Task
PIR, delivery of 2 sets of a deaeration plant with a capacity of 800 t/h operating in atmospheric mode.
Customer Feedback
JSC "TGK-11", JV "TPP-3", Omsk
Technical Director
As a result of comprehensive testing for 72 hours from 08/05/2021 to 08/08/2021, in accordance with the approved comprehensive testing program developed by Energoengineering Group LLC, Moscow, it was found that the equipment was operating normally, no deviations in operating parameters were detected, and the quality of the make-up water met technological standards.
The Commission's decision:
The operation of the deaeration and make-up unit has been tested with a load of up to 1100 t/h, with a design capacity of 1600 t/h (according to the plant's operating conditions in the summer). All functional and technological components are functioning in accordance with the project. At the same time, the parameters were within the limits specified in the factory instructions and the design.
The Customer has no claims to the Contractor regarding the quality of the work performed.
Chairman of the Commission: V.P. Soskov
The Commission's decision:
The operation of the deaeration and make-up unit has been tested with a load of up to 1100 t/h, with a design capacity of 1600 t/h (according to the plant's operating conditions in the summer). All functional and technological components are functioning in accordance with the project. At the same time, the parameters were within the limits specified in the factory instructions and the design.
The Customer has no claims to the Contractor regarding the quality of the work performed.
Chairman of the Commission: V.P. Soskov